Six products, each described by what it puts back on the panel. Three are trialled and tested underground; three were designed in 2025 and are looking for a host shaft. Which is which is marked on every card, and we do not blur the line.
Supplied with scraper attachments, sold in sets of two and fitted to the mine's existing scraper — required whether one part of the system is used or all three. The Corner Pulley is the part that has been underground; Parts 2 and 3 were designed last year.

Gulleys from blast 1
One winch cleans multiple panels around 90° corners.
See the product →
40 min per shift
Stops the rope wearing against the hanging wall, and the splicing that follows.
See the product →
5–10× rope life
Carries the full rope clear of the footwall, so it stops wearing out.
See the product →
1.5 m in 2 minutes
A 1.5 m hole in 2 minutes, to the same angle and burden every time.
See the product →
Operator out from under the drill
Remote drilling from a supported area, at the correct angle every hole.
See the product →
Keeps the blast you lose to sweeping
Keeps swept back areas clean, so sweeping does not cost you a blast.
See the product →For product detail, availability or contract work, a call or a message reaches us directly. The full company profile is here if you would rather read first.